Peras weekly update | 9 October 2026
We launched an initial testnet setup with the latest Peras code enabled and started debugging the first issues. Most were related to tweaking parameters to adjust Peras to the testnet’s faster pace.
Prometheus integration and work on polishing the testnet UX also continued.
Peras design
Preparation started on a document aimed at the Cardano Steering Committee, covering options and considerations for the crypto implementation needed by Peras on mainnet.
Revisions to the Peras CIP and Peras design document continued to bring them up to date with recent developments.
Ledger
cardano-ledger#6126 was opened with the changes needed to forecast the Peras protocol parameters of the current epoch. This will be followed by changes in Consensus to shift the validation context resolver by one epoch into the past and use forecasting for the present one.
Two further PRs, cardano-base#700 and cardano-base#701, were opened to start migrating part of the code in Consensus that needs to be made available to Ledger.
Consensus
Implementation of the historical certificate database prototype (MVP) is finished and currently under internal review. A comprehensive test suite has also been written for the database, with updates needed to account for recent changes.
Work started on ticking the extended ledger state at the start of Peras rounds, independently of processing new blocks.
#2326 was opened for internal review. This replaces PerasCertTicketNo with PerasRoundNo in the VolatilePerasCertDB.
Commits related to certificate size restrictions were isolated from the Peras working branch, and Peras #73 was opened against main.
Networking
Review of #5431 from the Network team is still pending. Peras 71 and Peras 72 are now approved (in spirit) and ready to be integrated against it.
Work also started on allowing certificate diffusion to download validatable certificates only, and on changes to signal the next round number in the outstanding FIFO.